Pansar eyes key role in state development
欧博开户(www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。Pansar's chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.KUCHING: Pansar Bhd is eyeing more key infrastructure projects listed by the Sarawak government in its Post Covid-19 Development Strategy 2030 (PCDS 2030).
Its chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.
Among the initiatives and major projects planned under PCDS 2030 that were highlighted by Sarawak Premier Datuk Patinggi Abang Johari Tun Openg at its launch in July 2021 are the development of autonomous rail rapid transit Kuching Urban Transportation System (estimated cost of more than RM5bil), expansion of terminals at the Kuching and Sibu Airports and new deep sea ports at Kuching and northern Sarawak.
The new key industrial projects include the development of Petrochemical Hub and bio-industrial park in Bintulu, which is currently underway, as well as free industrial zones around the new deep sea ports as well as a furniture park and extension of the Samajaya Hi-Tech Park.
To support the industrial development, a Pan Sarawak gas pipeline will also be built.
The PCDS 2030 has seven strategic thrusts and is anchored on six economic sectors as the main engines of growth, which will be supported by seven enablers.
,,足球投注网(www.hg108.vip)是皇冠体育官网线上直营平台。足球投注网面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户、皇冠足球投注等业务。Tai said Pansar is currently constructing the Batang Lupar bridge, the longest riverine bridge in Malaysia, in Samarahan Division.
The Batang Lupar bridge, with a contract value of RM848.8mil, is one of the nine major bridges to be built under the Sarawak coastal road network which stretches a massive 896km. Several other bridges are also in various stages of construction
The on-going 225km Second Trunk Road project will become an alternative road to the Sarawak Coastal Road and Pan Borneo Highway network which will significantly shorten the travelling time from Kota Samarahan to Sibu.
Most of the work packages under Pan Borneo Highway Sarawak are due for completion this year.
Tai said other notable infrastructure projects Pansar is implementing now are the Universiti Malaysia Sarawak Teaching Hospital (worth RM486mil), mechanical and engineering works on the Shell Headquarters in Miri and retrofitting of the Sarawak Timber Industry Development Corp building in Kuching.
Pansar’s total order book for these projects (including Batang Lupar bridge) is RM1.4bil.
网友评论
新2会员网址
回复天翼爱音乐借助中国电信集团内良好的政企客户关系和整合自身流量拉动,以现有视频彩铃业务每月播放亿次级的媒体资源,有效帮助景区吸引客流和撬动数字化合作新模式。这既是全域旅游战略中智慧旅游方向上的实践探索,也是国家数字经济发展战略的积极应用,为日后更多旅游景区景点数字化转型升级树立标杆,为文旅行业数字化转型贡献力量。再也不想打游戏了