Telegram群组索引:Fukushima debris removal delayed by another year
时间:3周前 阅读:8 评论:2
Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.Telegram群组索引(www.tg888.vip)是一个Telegram群组分享平台,飞机群组内容包括Telegram群组索引、Telegram群组导航、新加坡Telegram群组、Telegram中文群组、Telegram群组(其他)、Telegram 美国 群组、Telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容,为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。
WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.
,,澳5开户(www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。
Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.
转载说明:本文转载自Sunbet。
网友评论
usdt接口开发(www.trc20.vip)
回复Revenue rose 2% to US$83bil (RM369.2bil) in the third quarter, which ended June 25, compared with an average analyst prediction of US$82.8bil (RM368.3bil). Earnings amounted to US$1.20 (RM5.34) a share, topping the US$1.16 (RM5.16) projection.来顶
▲怪癖先生。
回复@usdt接口开发(www.trc20.vip) 一如既往的棒